News
Here’s what California’s offshore wind industry might look like. In a patch of calm water off the Port of Long Beach, 1,000-foot wind turbines would be assembled before they’re towed out to sea.
“If this bill becomes law, families will face higher electric bills, factories will shut down, Americans will lose their jobs ...
This 15-MW onshore wind turbine was installed October 8, 2024, at a site in Tongyu, Jilin Province, in northeast China. Source: Sany Group Sany said the turbine has a design life of 25 to 30 years.
Radia, a Colorado-based company, wants to build enormous aircraft to transport giant wind turbine blades. It’s betting that politics won’t get in the way.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results